Overview
This project will make improvements to approximately 3.24 miles of WIS 145, between WIS 100 and WIS 167, in Waukesha and Washington Counties.
View project location map here
Proposed Improvements
- Mill and overlay existing asphalt surface
- Reconstruct existing curb ramps to meet WisDOT and ADA requirements
- Remove one guardrail and replace six (6) guardrails
- Replace traffic signal at the WIS 145 and County Q intersection
- Replace various cross culverts and improve drainage
Traffic Impacts
WIS 145 is anticipated to be closed between WIS 100 and WIS 167 during construction. A detour will be posted utilizing WIS 100, I-41, and WIS 167. Access to local businesses and residents will be maintained.
Public Involvement
WisDOT hosted a Public Involvement Meeting for this project on Thursday, November 14, 2024. It was held at the Germantown Village Hall from 4 - 6pm. Below are the documents available at the meeting:
Schedule
Construction is tentatively scheduled to begin in 2026.
Status
Design phase. If you have questions or comments about this project, please feel free to contact the project staff listed below.