Project location
WIS 33 (Baraboo River to Village of Wonewoc south limits), Union Center to Wonewoc - Juneau County
Project overview
Proposed plans will mill and overlay 4.5 miles of WIS 33. The project involves milling 3.5 inches of the existing asphaltic pavement and placing a new mat of asphalt. In addition existing guardrail will be replaced, curb ramps will be upgraded to meet ADA requirements.
The proposed resurfacing overlay will consist of the following:
- Remove 3.5 inches of existing asphaltic pavement and place 4 inches of HMA
- 3-ft paved shoulders
- Update guardrail to current standards
- Update curb ramps in Wonewoc to meet ADA standards
Schedule
- October 2022 - Public Involvement Meeting
- 2027 - Construction anticipated
Traffic impacts/detours
WIS 33 will remain open to traffic during construction utilizing flagging operations.
Status/phase
Design
Contact information
John Bainter, P.E.
WisDOT Project Manager
(608) 785-9729
john.bainter@dot.wi.gov
Hannah Punzel
WisDOT Southwest Region Communications Manager
(608) 246-7907
hannah.punzel@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
TTY: 711
Email:
swr.dtsd@dot.wi.gov