WIS 35 (Wacota Street to US 10) and US 10 (Minnesota state line to WIS 29) - Pierce County

Location

The project in the Pierce County city of Prescott includes work on US 10 from the Minnesota state line to 1,700 east of WIS 29 and WIS 35 from Wacota Street to US 10.

Overview

The pavement on these segments of US 10 and WIS 35 are showing signs of deterioration. To address this and other issues, the Wisconsin Department of Transportation is proposing the following on:

  • US 10
    • Milling 2.5 inches off the existing asphalt pavement sections of the roadway and paving 2.5 inches of hot-mix asphalt over the highway from the Minnesota state line to Lake Street North/Locust Street North
    • Making concrete pavement repairs in the existing concrete pavement sections from Lake Street North/Locust Street North to 1,700 feet east of WIS 29
    • Resurfacing the park and ride lot on Pearl Street just north of US 10
    • Completing traffic signal and detention basin work
    • Replacing concrete barrier and guardrail
    • Making storm sewer, curb and gutter and spot curb ramp improvements
    • Extending the sidewalk from the Campbell Street/Orrin Road intersection to the Eagle Ridge Road intersection
    • Installing new pavement markings
    • Clearing the roadside
  • WIS 35
    • Milling 2 inches off the existing asphalt pavement sections of roadway and paving 2 inches of hot-mix asphalt over the highway from Wacota Street to Kinnickinnic Street
    • Making concrete pavement repairs in the existing concrete pavement sections from Kinnickinnic Street to US 10
    • Rehabilitating one retaining wall and replacing another
    • Making storm sewer, curb and gutter and spot curb ramp improvements
    • Replacing guardrail at spot locations
    • Extending the sidewalk from the Monroe Street intersection to the existing sidewalk to the northwest
    • Installing new pavement markings
    • Clearing the roadside

Real Estate

Real estate impacts are anticipated but will be determined during final design.

In This Together

WisDOT recognizes businesses located in work zones or impacted by detour routes have special needs. WisDOT's In This Together program provides information to help businesses better understand the overall process and prepare for what's ahead.

Schedule

Construction currently is scheduled for 2029.

Traffic Impacts

During construction, US 10 and WIS 35 are anticipated to remain open, but motorists might encounter lane closures, reduced speeds, temporary access adjustments, temporary pedestrian accommodations and short-term detours for localized work.

Contacts

Lauren Zidek
WisDOT Northwest Region Consultant Project Manager
(414) 410-6815
lzidek@hntb.com

Nathan Ulness
WisDOT Northwest Region Project Supervisor
(715) 836-3914
nathan.ulness@dot.wi.gov

Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285
nwr.dtsd@dot.wi.gov

Back to top button