US 8, WIS 32 to Peshtigo River Bridge, Forest County

Location

US 8, WIS 32 to Peshtigo River Bridge, Forest County

Project Overview

The purpose of this project is to extend the service life of the pavement, enhance safety, and maintain acceptable drainage along approximately 7.4 miles of US 8 from WIS 32 to the Peshtigo River Bridge in the towns of Laona and Caswell.

Traffic Impacts

Construction is currently scheduled for the summer of 2028. During construction, US 8 will remain open to traffic utilizing daytime single lane closures, managed by flagging operations. There may be instances where staged construction or short-term closures at intersections are required. Motorists can expect some delays to occur, but delays will be managed through limiting contractor operations at critical times. Access to residences and businesses will be maintained except for short periods while construction operations are directly adjacent to the entrances. Temporary pedestrian facilities will be in place during the replacement of sidewalk curb ramps.

Real Estate

  • Local officials meeting: Oct. 19, 2023
  • Public involvement meeting: July 24, 2024.
  • Comment period July 24, 2024 to Aug. 16, 2024
  • Complete project design: May 2027
  • Construction: 2028

Public Involvement

A public involvement period was held. The following material was provided:

Contacts

Andrew Casper, Project Manager
Andrew.Casper@dot.wi.gov
(715) 365-5713

Rhinelander Office
510 N. Hanson Lake Rd.​
Rhinelander, WI 54501
(715) 365-3490
WI Telecommunications Relay System (TTY): 711
Fax: (715) 365-5780
ncr.dtsd@dot.wi.gov

Wisconsin Rapids Office
1681 2nd Ave. S.
Wisconsin Rapids, WI 54495
(715) 421-8302
WI Telecommunications Relay System (TTY): 711
Fax: (715) 423-0334
ncr.dtsd@dot.wi.gov