skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 10 (WIS 13 to I-39) Expansion

Need/purpose

Schedule

Maps

FAQ

State highway changes

Roundabouts

Environmental documents

Public involvement

Traffic impacts

Contacts

US 10 (WIS 13 to I-39) Expansion - Traffic impacts

View Wisconsin 511 travel information for current traffic conditions.

Wood County

US 10
Location: White Oak Rd. to Brookside Rd.
Schedule: Jul. 11 to Jun. 2012
Cost: $9 million
Description: Crews are constructing a four-lane divided highway between Marshfield and Stevens Point. Crews will construct and prepare this section of the new alignment for concrete paving, which will occur in 2012 under a separate contract.
Traffic impacts: During construction, existing US 10 will remain open to one lane in each direction. Motorists should be alert for trucks crossing and slow moving vehicles.

US 10
Location: Klondike Dr. to Wood County BB
Schedule: Jul. 5, 2011 to Dec. 2012
Cost: $12.3 million
Description: Crews are constructing a four-lane divided highway between Marshfield and Stevens Point. This project involves the construction of roundabouts at the US 10/Klondike Dr./WIS 13 intersection, the new US 10/County BB intersection, and the Central Ave./existing US 10 intersection. Crews will also construct and prepare the new alignment of US 10 for concrete paving.
Traffic impacts: During construction, existing US 10 will remain open to one lane in each direction with a 12-foot width restriction. Crews will be working along the east side of US 10/WIS 13 from Klondike Dr. to Central Ave..

Work zone safety tips

  • Buckle up for safety
  • Expect the unexpected
  • Stay alert
  • Watch for flagging operations
  • Merge as soon as possible
  • Don't speed. Remember, fines double in work zones
  • Don't tailgate
  • Keep a safe distance
  • Observe posted signs
  • Be patient

Top Return to top


WisDOT 511 logo.

Rd. construction.

Related information

WisDOT roundabout information

'In This Together' program - Information for businesses located in work zones

Completed projects

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey