skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Doing Business
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Oversize/
overweight permits

Automated issuance permits

Determine if a permit is required

Single trip

Multiple trip

Apply for a permit

Online instructions

Forms/applications

Hours of operation

Permit requirements

Detour and construction information

Seasonal weight restrictions

Forms and applications

This page includes:

  • Forms to apply for most permits
  • Permit costs
  • Maximum permit dimensions and weight
  • Conditions of use of the permit
  • Related Trans rules

All forms are in Adobe PDF PDF format except where indicated. PDF forms can be used in two ways. You may either:

  • Print the form and then write in your information, or
  • You may type your information into the fields provided on the form and then print, sign and mail it to the address on the form.
  • Each form contains fields for you to type in your information. After selecting the form, click in an appropriate field to make an entry. You may use your tab key to advance to the next available field.

Determine if a permit is required

  • SP4415 - Motor Vehicle Size Regulation Summary
  • SP4075 - Maximum Weight Limitations Summary

Applications and information needed for single trip permits

Single trip building permit (SB)

Mobile home or modular building section (SM) 

All other non-divisible loads (SS)

Top Return to top

Applications and information needed for multiple trip permits

Equipment, machinery, materials, self-propelled vehicles (AA)

  • MV2614 - Information and fees
  • MV2612 - Application
  • Trans 255 - Standards and procedures for multiple trip permits
  • Trans 251 - Vehicle Weight authorized by multiple trip permits
  • Bridge capacity List A - For permits 130,000 pounds and less
  • Bridge capacity List B - For permits 150,000 pounds and less
  • Bridge capacity List C - For permits 170,000 pounds and less

Building multiple trip (BM)

  • MV2614 - Fees (insurance requirements specified in statute)
  • MV2955 - Application
  • Trans 255 - Standards and procedures for multiple trip permits

Mobile home or modular building section (MH)

Garbage, refuse, & recyclable scrap (AG)

Fruit/vegetable/raw forest at 90,000 lbs (RF)

Raw forest products at 98,000 lbs (RS)

Hay and straw (HM)

Potato seed (PS

Michigan border (MI)

Grain, coal and iron ore (AC)

Wind tower permits

If you have questions:

Wisconsin Department of Transportation
Motor Carrier Services
P.O. Box 7980
Madison WI 53707-7980

Top Return to top


Related link:

Motor carrier forms and publications

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey