Project location
WIS 80 (Iowa County Line to Wisconsin River), Muscoda - Grant County
Project overview
The purpose of the project is to address the following needs for this section of WIS 80:
- The deteriorated pavement has reached the end of its service life.
- The curb ramps along the project are of substandard design.
The proposed improvements include the following:>
- Remove all existing pavement and replace with new asphaltic pavement.
- Upgrade all curb ramps to meet current ADA standards.
- Spots of curb and gutter will be replaced along with guardrail upgrades.
Schedule
- 2024 - Public Involvement
- Summer 2028 - Construction anticipated
Traffic impacts/detours
WIS 80 will remain open with reduced lanes and a flagging operation during construction.
Status/phase
Design
Contact information
Anthony Buerger, P.E.
WisDOT Project Manager
(608) 246-7901
anthony.buerger@dot.wi.gov
Hannah Punzel
WisDOT Southwest Region Communications Manager
(608) 246-7907
hannah.punzel@dot.wi.gov