WIS 29, Clark County Line to County E, Marathon County

Location

WIS 29 westbound, Clark County Line to County E South, Marathon County

Project Overview

WIS 29 pavement in the westbound lanes from WIS 13 Bridge to County E South is showing signs of deterioration. The existing concrete pavement has longitudinal cracking and joint deterioration. The westbound off ramp at Silver Maple Lane is in poor condition. The existing asphalt shoulders are nearly 30 years old and are in poor condition. Further, the guardrail along this stretch is in need of replacement to update to current standards. Pedestrian curb ramps at WIS 13 will be brought up to standards. Proposed

Work includes:

  • Patch deteriorated areas of concrete pavement along the westbound lanes for the project length.
  • Replacing the westbound off ramp at Silver Maple Lane with concrete pavement
  • Replacing the asphalt shoulders
  • Update the guardrail within the project limits
  • Evaluate and update the curb ramps along WIS 13 at the westbound WIS 29 ramps

This improvement concept will address the identified issues and extend the pavement service life. The eastbound lanes along this same section were addressed with a construction project in 2020.

Traffic Impacts

WIS 29 will remain open to traffic during construction by utilizing crossovers at each end of the project. One crossover will be just west of the county E south intersection and the second crossover will be just east of the westbound off ramp to WIS 13.

No work will be performed during the following holidays:

  • Memorial Day -Noon Friday May 23 through 6 a.m. Tuesday May 27, 2025
  • Fourth of July - Noon Thursday July 3 through 6 a.m. Monday July 7, 2025
  • Labor Day - Noon Friday Aug. 29 through 6 a.m. Tuesday Sept. 2, 2025

Real Estate

No real estate acquisition is anticipated

Schedule

  • Public Involvement Meeting: November 2023
  • Design Study Report: January 2024
  • Design Finalized: November 2024
  • Construction scheduled for Summer 2025

Public Involvement

A public involvement period was held. The following information was shared.

Contacts

Korey Boehm, Project Manager
korey.boehm@dot.wi.gov
715-421-8311

Rhinelander Office
510 N. Hanson Lake Rd.
Rhinelander, WI 54501
(715) 365-3490
WI Telecommunications Relay System (TTY): 711
Fax: (715) 365-5780
ncr.dtsd@dot.wi.gov

Wisconsin Rapids Office
1681 2nd Ave. S.​
Wisconsin Rapids, WI 54495
(715) 421-8302
WI Telecommunications Relay System (TTY): 711
Fax: (715) 423-0334
ncr.dtsd@dot.wi.gov