The existing concrete on WIS 29 and WIS 29 ramps is showing signs of deterioration. The purpose of this project is to extend the service life and improve the riding surface by repairing concrete joints, replacing sections of deteriorated concrete pavement, mill and overlay the asphalt shoulders and replace the guardrail.

Traffic Impact

WIS 29 is proposed to remain open to traffic during construction, utilizing single lane closures and bi-directional traffic with crossovers for pavement replacement areas. Ramp closures will be necessary at times and detours will be posted.

Real Estate

No real estate is anticipated.

Project Schedule

  • Public Involvement: September 2023
  • Complete project design: November 2024
  • Construction currently scheduled to begin in 2025.

Public Involvement

Contacts

Zach Gruling, Project Manager
Zachary.Gruling@dot.wi.gov
715-365-5764

Rhinelander Office
510 N. Hanson Lake Rd.
Rhinelander, WI 54501
(715) 365-3490
WI Telecommunications Relay System (TTY): 711
Fax: (715) 365-5780
ncr.dtsd@dot.wi.gov

Wisconsin Rapids Office
1681 2nd Ave. S.
Wisconsin Rapids, WI 54495
(715) 421-8302
WI Telecommunications Relay System (TTY): 711
Fax: (715) 423-0334
ncr.dtsd@dot.wi.gov