Project Overview
We are proposing to improve 0.3 miles of WIS 22 from WIS 23 to approximately 480-feet north of Park Street. The existing WIS 22 pavement is showing signs of deterioration in the form of cracking and wheel path rutting. In addition to the deteriorating pavement, the WIS 22 intersection with WIS 23 does not accommodate turning movements for large trucks and farm equipment that frequently use the two highways.
Traffic Impacts
Construction is currently scheduled to begin in Spring 2027. During construction, WIS 22 will be closed to through traffic during construction. Through traffic will be detoured on WIS 73 and WIS 23 via the city of Princeton. Access to homes and business will be maintained at all times. Temporary driveway closures will be necessary during parts of the construction process. WisDOT will contact homeowners and businesses in advance before closing a driveway. Construction is currently scheduled for completion late Summer of 2027.
Real Estate
Additional right of way will be required for this project. Approximately 22 parcels will require a Temporary Limited Easement (TLE) and/or right-of-way acquisition throughout the corridor. Minor Right of Way purchases will be needed at the intersections for curb ramp and intersection improvements at WIS 23. WisDOT expects to begin real estate acquisition in July 2024.
Rights of Landowners Under Wis Eminent Domain Law Wis Stats 32.05]
Schedule
- Local Officials Meeting: Jan 25, 2024
- Public Involvement Meeting: Feb 6, 2024
- Final Right of Way Plan: July 2024
- Complete Project Design: May 2026
- Construction currently scheduled to begin Spring 2027
Public Involvement
A public involvement meeting and public comment period was held. The materials below were shared.