The roadway pavement and culvert pipes are experiencing deterioration. The Wisconsin Department of Transportation is proposing the following improvements:

  • Resurface the roadway with asphalt
  • Pave a 3-foot shoulder
  • Replace failing cross culvert pipes between Hazelnut Trail and Cranberry Creek Bridge
  • Replace guardrail

Traffic Impacts

For culvert replacements, WIS 173 will be closed to thru traffic and detoured via WIS 73.

For resurfacing, WIS 173 will remain open to a single lane of traffic controlled by flagging.

Real Estate

Some minor temporary limited easements will be needed for culvert replacements and grading. Real estate acquisition is expected to begin in September 2023.

Public Involvement

A public Involvement was held July 19. The following information has been presented:

Project Schedule

  • Public comment submission: July 19 to Aug. 14, 2023
  • Real estate acquisition begins: September 2023
  • Complete project design: August 2024
  • Construction currently scheduled: 2025>

Contacts

Felix Ogles, WisDOT Project Manager
Phone: (715) 421-8329
Email: Felix.Ogles@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
North Central Region, Wisconsin Rapids Office
1681 2nd Ave. S.
Wisconsin Rapids, WI 54495-4768
Phone: (715) 421-8302
Fax: (715) 423-0334
WI Telecommunications Relay System TTY: 711
Email: ncr.dtsd@dot.wi.gov