Project Overview

The purpose of the project is to restore deteriorated surface pavement to extend the roadway service life, replace deteriorating culverts, replace substandard guardrail, perform minor bridge repairs and signal updates.

Traffic Impacts

Mainline work will be done using single-lane closures of US 10. Ramp work will be done using detours to adjacent ramps. Work at the WIS 96 and 110 intersection will be staged with lane closures. See details below in the Public Involvement section.

Real Estate​

No Real Estate acquisition is anticipated

Project Schedule

  • Public Involvement: November 2023
  • Design Study Report: May 2024
  • Finalized Design: August 2025
  • Construction is currently scheduled as early as summer 2026 or summer 2028

Public Involvement

Letters have been sent to affected property owners. This project involves several traffic control methods. Below are details of each of the traffic control methods that were shared:

Contact

Korey Boehm, Project Manager
korey.boehm@dot.wi.gov
715-421-8311

Rhinelander Office
510 N. Hanson Lake Rd.
Rhinelander, WI 54501
(715) 365-3490
WI Telecommunications Relay System (TTY): 711
Fax: (715) 365-5780
ncr.dtsd@dot.wi.gov

Wisconsin Rapids Office
1681 2nd Ave. S.
Wisconsin Rapids, WI 54495
(715) 421-8302
WI Telecommunications Relay System (TTY): 711
Fax: (715) 423-0334
ncr.dtsd@dot.wi.gov